Customization: | Available |
---|---|
Power Source: | Electricity |
Application: | Food |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Main Uses:
The machine made up of main engine, auxility engine and electric-box, featuring winnowing without sieve or mesh, ever granule size, continuous operation, etc. The machine reaches advanced world-level and is widely used for material grinding in chemical and foodstuff industries, etc.
Working Principle:
Materials are transported into smashing mesh via screw conveyor, then crushed by the high-speed revolving razor blade. With the negative pressure, materials will be transported into cyclone separator, ejected by pass-breezing machine. Without the powder float in whole producion line the powder float in the sky.
Technical parameters
Specification and mode | WFJ-15 | WFJ-18 | WFJ-36 |
Productive capacit(kg/h) | 10~200 | 20~450 | 60~1000 |
Size of raw material to be fed(mm) | <10 | <12 | <15 |
()Size of raw material to be discharged (mesh) | 80~320 | 80~450 | 80~450 |
Total power (kw) | 13.5 | 17.5 | 38 |
Main revolution(r/min) | 4500 | 4480 | 4000 |
Overall dimensions (L×W×H)(mm) | 4200×1200×2800 | 4700×1250×2900 | 9000×1500×3800 |
Q1: What is the equipment price?
A1: The equipment price is determined according to the product size, product characteristics and product material.
Q2: What is the packaging method?
A2: Naked packaging and wooden box packaging, damage compensation
Q3: What is the temperature range?
A3: The temperature range is 50-270 degrees and can be controlled
Q4: What is the heating method?
A4: There are many heating methods, such as steam, hot air, electric heating, natural gas, etc.
Q5: How long does it take to deliver?
A5: Within 15 days at the earliest
Q6: What does your after-sales service include?
A6: Our afer-sales service includes
(a) Equipment installation and commissioning
After the equipment is completed and the buyer's installation and commissioning notice is received, the supplier will immediately send personnel to install and commission the equipment.
(b) Operator training
Since the equipment is installed and commissioned, the buyer's operators will learn the working principles of the equipment and the maintenance elements during the operation process under the guidance of the supplier's after-sales service personnel, master the theoretical and practical experience of using the equipment, and produce qualified products.
(c) Equipment warranty
The equipment warranty period is one year. The supplier will provide free repairs for any equipment failure caused by manufacturing quality during the warranty period.
(d) Technical service
The supplier will provide free technical consultation for any technical problems encountered during use.
(e) Equipment maintenance after the warranty period
If there is any problem with the equipment after the warranty period, the supplier will provide high-quality maintenance services and original accessories at a unified preferential price.
(f) Service commitment
All door-to-door services will arrive in the most timely manner.
(g) After-sales service spare parts inventory guarantee
The supplier has sufficient spare parts and will send them out within 4 hours according to user needs.